|
|
 |
The benefits of our Patented Systems |
Navigate Profiles
|
- Lower Material Cost
- Mobilisation and demobilisation costs are reduced
- Increased speed of installation compared to imported sheet piling
- Our proprietary mechanical anchors can be proof loaded immediately on installation
- Our sand anchors may be tensioned without the aid of grout
- Our rock tri-anchors can be pre-tensioned prior to the curing of grout and then post tensioned
- Sheet piling can be placed 100mm from a vertical face wall to back of sheet as demonstrated in photographs opposite.
- Our permanent load bearing concrete screed walls can be placed in front of the sheet piling, using it as sacrificial formwork, and creating additional space in basement construction.
- One sub-contractor to install and construct a total retention system whether it be temporary and/or permanent works. This creates less site congestion as one machine is able to carry out all functions of the installation process
- Cost effectiveness of our retention system, particularly when incorporated prior to or during the project design stages, maximises the advantages offered by the “Total Retention Packages”.
|
|
|
|
|